Installation of a landline and broadband installation takes approximately 14 days. When you contacted your phone and internet provider to connect to the nbn™ access network, they would have arranged an installation time for an nbn™ approved technician to visit your home or business to install the necessary equipment. At present TalkTalk ’s platform. build fibre infrastructure to your new buildings and development sites. It is my understanding that if you do not have a working broadband or less than 30Mbps then there is an escalation process to bring the installation back before 1/3/21. Re: FTTP Installation in block of flats. If a neighbour already had FTTP installed and working, we'd be less concerned about possible outage. Both addresses show FTTP on Demand as available. What does it say for 'FTTP install Process' ? Here is example. Our services include: Voom Fibre (with up to 500Mbps download speeds on Voom 500). Multi-stage developments. Hi all, Openreach are installing FTTP tomorrow. Just curiosity as the chances of FTTP appearing in my village in my lifetime are slim to none. This has now been put back 2 days to Wednesday 22nd November. Happy to show me the whole process, blowing the fibre and splicing etc. Any sparky you hire won't have any of this. FTTP. An overview of the Openreach FTTP setup. We have adapted our successful Service Delivery model to ensure we deliver the same high-quality service for FTTP. Some folks also refer to it colloquially as ‘Fibre to the Home’ or ‘FTTH’. First agree with your engineer where the FTTP connection will enter your premises. Re: FTTP Installation (Landlord problem) FTTP will become the primary and only available fixed line method of getting a broadband connection. G. This brings the fibre optic cable up to the outside of your premises (what we call the ‘External Demarcation Point’). First agree with your engineer where the FTTP connection will enter your premises. Individual requirements may vary. Our FTTP broadband is called Full Fibre. On 20 September 2013 I blogged about the first stage of my Fibre To The Premises (FTTP) broadband installation. If you can get Quickstart, you can choose one of two delivery options. 4 x Gigabit LAN. With Full Fibre installation, we'll upgrade the master phone socket (the white box on the wall) and install an Openreach modem (ONT), which connects to the fibre optical cable that comes into your house. Openreach have today added 67 new locations into their UK “Fibre Cities” roll-out programme for 1Gbps capable Fibre-to-the-Premises broadband ISP technology, which forms part of their £12bn project to cover 20 million premises by around the mid to late 2020s (2025 – 2030). I would like the ONT to be placed on the wall at the back of a cupboard, I have attached a picture to show this. All FTTP installations use this 2-stage method now to avoid (hopefully) disappointment. As mentioned previously the FTTP connection may not come in at the same point as the copper wire enters. If I go into the living room, client steering puts me onto the mesh network, I can only get 200-300mbps. FTTP installation questions. This could be due to many factors including issues with the. Security. However, if you have FTTC then it's unlikely you'll get FTTP any time soon. The author of the above post is a thinkbroadband staff member. " As I understand it, KCI refers to the BT ordering process. 50,000 per week) and they aim to reach 25m by Dec 2026 ( here) – 6. I currently have FTTC with Sky but I'm looking for the reliability/extra speed as I work from home full time. The nokia ONT's certainly are teeny so mentioned there certainly was no. Free returns Within 90 days. When I had mine done, they told me the whole process would take around 2 months before I will be hooked up and running. 0 stage install – between 1 and 3 working days. Me, her and my niece. Get on the phone if it’s taking noticeably longer than an hour, but some providers note that. Install was on 05/12/22, with an exceptionally helpful Openreach subcontractor, have been calling BT each week for an update (2 calls) both of which the call handler gets onto a live chat. Smart City Recruiters Ltd. Easily apply: Driving to customers houses and premises. Preparatory to installation of FTTP in my home I want to lay some internal ducting to carry the fibre cabling between point of entry into the house and the Openreach modem. If I stand next to the gateway in the kitchen, client steering has me on the gateway with my iPhone, I can get roughly 700mbps down and up. FTTP Install Process – If ‘1 Stage’ is stated under this column heading, it basically means that an engineer will have to come out to install the final connection inside your property. 3 Following ourHi all, I'm moving in with my sister for a bit and so there will be 3 of us living there now for a while. I ordered on Sunday 17th May, the first engineer. Following this, your order will get sent to planners who will. Enterprise mobile solutions. FTTP Install Process – If ‘1 Stage’ is stated under this column heading, it basically means that an engineer will have to come out to install the final connection inside your property before you can benefit from the improved service. FTTC to FTTP Upgrades. A wayleave is permission from the landlord, or land owner, to access their building or private land to install or repair network and equipment. Re: Delayed Installation FTTP. We have made several attempts to initiate the process of establishing an nbn network connection to your building, however we have been unsuccessful in our engagement with the builThis may include running new cables, or disconnecting old extension wiring and powerline adapters. For those sites where FTTP install would be too costly a Fibre to the Cabinet (FTTC) or copper connection can be provided. Fibre-optic core is made of strands of glass or plastic that carry through pulses of flashing light, without any losses due to electromagnetic interference. Blow 7 store the bundle at the CSP, splice through at the splitter then confirm light traffic at the CSP. Re: Full fibre install. 8K. If it says 'KCI2 Assure', there will be a survey of your duct. For developments that will be completed over multiple stages, after completing an nbn New Developments application for your first stage, you can submit additional stage applications relating to your eligible development through the nbn® New Developments portal. These install work, and at the end. For all ADSL and WBC Fibre to the Cabinet (VDSL or G. This is the fiber installation option you want to look for, as it will give you the best performance. This survey normally won't need you to be present, but if it's not. Fibers 9 to 12 are the distribution fibers that connect a stage 1 splitter to a stage 2 splitter. Not sure if BT still do a 40Mb package but it doesn't show for me. For starters, you don't need. Link your AP to your router via ethernet cable so the backhaul will be wired instead of over WiFi. Fibre to the Curb (FTTC) customers will also be able to request an upgrade to FTTP. Also is Plusnet likely to offer FTTP in the future, or do i migrate. They are also on strike on Monday. Once we receive the payment for the build cost, we can start the construction work to install nbn FTTP at your premises. PDT. The package was removed from sale last November 2022. The install is listed as a 1 stage install and we're connected via a pole which loks to have the black fibre modules at the top of it. On mine, it says "1 Stage", and in the notes "Single Dwelling Unit Residential UG Proven Clear. OR then moved to a one stage install. If the OR website says FTTP is coming soon, then that's a good sign. We provide solutions to all sizes of organisations, from small and medium-sized businesses (1-250), right up to enterprise-level (250+) as well as public sector organisations. 5 inch plastic duct 56. 3. The nbn approved technician will install Fibre to the Premises (FTTP) connection in parallel to your existing Fibre to the Node (FTTN) or Fibre to the Curb (FTTC) connection. 1 stage installs tend to be when the customer is feed over head or existing ducting is identified. Gives no reason from OR as to why the installation can't be done. I am hoping to be able to have full fibre installed as soon as our local network is up and running. Vouchers worth up to £4,500 for homes and businesses help to cover the costs of installing gigabit broadband to people’s doorsteps. The entire trip your connection takes to and from the premises travels on fibre cabling. I know this isn't a big deal. -----. My questions relate to how the fibre will enter my home, it's a relatively modern. FTTP install process: 1 Stage. It’s also a way for Openreach to be able to compete with altnets in the medium term, who deliver over FTTP but primarily compete on price. This means data passes quicker, but you need to be close to your street cabinet or an installed ‘node. If "WBC FTTP" is shown as available it now has a "FTTP Install Process" column. In the UK, Sky now offers a choice of full fibre broadband plans, making use of a dedicated fibre-to-the-premises (FTTP) connection into your home. Compatible with Smart Wi-Fi Booster 3. fast) services, the stable line rate will be determined during the first 10 days of service usage. 77 Comments. Currently EE broadband customer FTTC mid-plan, but internet keeps dropping out/interference. Where the copper comes into the house at the front I don’t have any power. OR then moved to a one stage install. More recently the ISP has launched Digital Voice, which is a VoIP style product that sends the voice transmission over your broadband connection (i. Everything you need to know about our Fibre to the home installation process i. If your parents order SuperFast Fibre from BT it will be 55Mb FTTP. If you already have an ONT, it’s very quick to get connected. BT_SMS is also used to send out Openreach video on Vimeo to guide customers through the FTTP installation process as Openreach use Vimeo now. In theory, it's a PM appointment (that's at least what we requested). Your new fibre optic connection will be built in two stages: the External Installation and the Internal Installation. If you look below the table, a reason might be listed, such as blocked ducts or line of sight issues. if your comments about corrosion in master socket are correct then that is cause of your problem. Areas of high activity/traffic in your house where it may be bumped or knocked. I've got an FTTP installation coming up, Stage 1 this Thursday afternoon and I will be present and then a couple of weeks later Stage 2, again I will be present. The install was very quick even though I needed a dig team to repair a duct at the end of my driveway. As Tabatha outlined in her blog ' How full fibre can make your life better ' here are just 5 reasons to switch to full fibre: Reliability goes through the roof; Ultra HD dream-stream. FAQ. 14/02/2021 - DIY installed 22mm barrier pipe as conduit from outside wall to inside wall ready for fibre with a couple of draw ropes. I want to carry out some internal prep work in advance, and wonder if anyone could comment, based on current OR procedures. All I can say about our connection is: The external hardware (Splitter, DP and Manifold) were a 2011 install that the system said wasn't there until end of 2016. Virgin Media M125 Fibre Broadband. Then just follow our step-by. Watch our video for step-by-step instructions on how to install Openreach’s fibre to the premises (FTTP) equipment. The pole is on the same side of the road and approx 15m away. The story so far: I had the 67 mbps FTTC service from Vodafone (I was unhappy with this as I was only recieving 30mbps down). e. Now again you see a Planned state for FTTP, but it normally goes in a matter of days when orders can be processed. The NBN installation process varies a bit based on the NBN technology that’s used to connect your home. The new PSTI Bill ( Summary) also includes some complementary changes to the. An NBN technician may visit your home to prepare for installation and identify any obstacles. 1 stage install – between 9 and 18 working days, depending on availability Contact a Service Provider with a FTTP compatible broadband product. An office or study where you want the connection to be strongest. 38 comments. Leading to. Everything went smoothly until the engineer tried to activate the broadband and test the connection via my SH2. 1. Just checking the BT wholesale checker and noticed 'KCI2 Assure' is now being displayed for WBC FTTP Install Process. New FTTP Install via duct, what happens to copper cables. On some occasions, our engineers may not be able to complete the work the same day. 6. Currently the copper connection runs down to a bedroom window and in through the window frame. The newer 1+1 ONT used to come in a case that housed that and the BBU. In this article, we’ll look at Sky’s full fibre broadband, including the plans available. WBC FTTP Up to 1000 Up to 220 -- Available 1 Stage. At present, Sky’s full fibre broadband service is available in around 41% of UK homes. about 50 years old. What a joke. the ONT will be positioned adjacent to the outside wall) to which the customer then attaches the router, provided by their communications provider. I live in a detached house, currently the phone line comes up in the middle of the house under the stairs, I have had low level cupboards with a bench top installed there and the NTE5 is in behind one of the cupboards, the cupboard has no back on. Hi all, I'm about to have an FTTP connection finalised at my newly built house. But I guess it depends on how busy Openreach are in your area as to the timeframe. 17-05-2022 02:55 PM. 17th October, 2023 (30 Comments) Ofcom has today published the latest edition of their forecast for Planned Network Deployments, which predicts that the full fibre (FTTP) broadband ISP lines are on course to cover 91% (27 million premises) of all UK properties by May 2026 – rising to 94% for “gigabit-capable” networks (i. Openreach has two ways of physically delivering its GEA-FTTP service but the 1&2 Stage install note on the BT Wholesale checker does not refer to whether a FTTP location is going to use spliced or using connectors. NAD Keys FTTP (including FTTP On-Demand) is only available with a Gold National Address Database key. Openreach has now announced a series of changes to FoD that will be introduced from 1st September 2020. Re: FTTP Install Process [ re: deleted ] [ link to this post ] Stage 1 install date should be quick to get, KCI 2 it will need someone to possible have a peak to figure out what needs doing e. Standard installation of NBN equipment should take around two hours but it may take as long as eight hours, depending on the complexity. . Hi All, Last time I had a new line installed, because it was a 2nd phone line to the house I managed to convince the Openreach engineer to install the phone line to the upstairs spare room. distribution fibers. Hello all, long time no post. It could be ZEN have not established this with OR yet. 4 x Gigabit LAN. David. In either case, you'll have an ONT and then the Sky Hub router. 13-11-2017 1:47 PM. ; Full Fibre 2 offers average download speeds of 67Mbps. 1 stage install: this is when the fibre cable termination is quite close to your premises. Fibre to the premises (FTTP), also known as ultrafast full fibre broadband, involves laying fibre optic cables directly from the broadband exchange right into your home. Previously, it was just a one-stage process. ”. Go to solution. The UK's fibre future is within reach. Threads. Instructions on how to install our equipment. Eastbourne. The broadband checker website lists my address with the following data: Featured Products Downstream Line Rate(Mbps) Upstream Line Rate (Mbps) Downstream Range (Mbps) Availability Date FTTP Install Process WBC FTTP Up to 1000 Up to 220 -- Available 1 Stage Our records show the following FTTP network service information for these premises. The fibre cable was run to the premise and left in an external Customer Splice Point box (CSP). If you have ducts, they will pull the fibre through the duct to where the existing copper comes out of the ground. In either case, you'll have an ONT and then the Sky Hub router. This is a 1000mbps line. [ re: Ryan1506] [ link to this post] This means the install will need a pre-survey just to validate or check things. There was a small rectangular openreach access point set just outside my driveway recently. I’m talking about the box that is mention here: “ First of all, we'll connect a fibre cable to a small box that we'll fix to your outside wall, close to where your phone line enters your home. The duct to the property is also internal (which I understand is atypical) and so OR would require access if R&R was needed, which could be problematic with current restrictions. If we need permission to install new apparatus on private land. FTTP from pole via loft space. 2)Depending on where the exchange is on the project it can be days, weeks or months. My property is served by underground cabling at the moment however the way the cable comes in is a bit odd. 2 million recently built homes passed. Next door has FTTP. External grade cabling has a tough PVC sheath and worse yet can be gel filled, which can be flammable, so fuel to a fire. The Full Fibre difference. Re: FTTP cable entry into house. For your address to have FTTP availability shown on checker sites , then OR must have already placed a fibre network CBT in the footway box close to your home , from this box there will already be a duct either directly or via a duct tee to your house wall , it currently contains your copper pair lead in cable. The handbook for building the fibre infrastructure also explains how to install our equipment yourself. Forgive me if this has been asked many times before. Stage one would be to get the tubing (OH/UG) up to the CSP at the customers premises. So my local area has gone live this week with Openreach FTTP and myself along with a number of people in the street have placed orders today for the new service. FTTP install process: 1 Stage. Openreach normally carry out the FTTP installation (including adding the ONT) there are some cases where Sky are able install the ONT. Stage 1 install date should be quick to get, KCI 2 it will need someone to possible have a peak to figure out what needs doing e. We would like to show you a description here but the site won’t allow us. FTTP install process: 1 Stage. La FTTO (fibre dédiée) correspond à un déploiement unique à destination de l'entreprise cliente ; Elle est plus coûteuse, mais donne accès aux plus hauts niveaux de services ; La FTTH (fibre mutualisée) est partagée avec d'autres utilisateurs, professionnels ou non ; Elle s'adresse davantage aux petits professionnels et. However I can't seem to be able to confirm if this means we will be enabled for FTTP and if so a. The average connection times are between 9 and 18 working days (subject to engineer. " Ref: KCI2 Assure :: Fibre Broadband :: think broadband. This will keep also your old vDSL / landline service still active and going to your house. Re: Full Fibre 1 Stage Install. Openreach’s infrastructure connects homes and businesses across the UK. This is the largest HFC-to-FTTP network migration to have been announced anywhere in the world. But the day after I signed up the nbn contractor appeared at my door at 9am and 2 weeks later I was on fttp. The rope was passed through the ducting probably 6 weeks before my FTTP install completed. Some of the recommended locations for installation include: Within 1. If it says 'KCI2 Assure', there will be a survey of your duct. Initial attempts to engage key businesses in Australian telecommunications in planning and development; and. Price adjustment. We set out the process we expect to follow in Annex 11 of the WFTMR Statement. The rest of the village has no OR FTTP availability. FTTH is a synonym for FTTP to some extent. We ordered an upgrade to the Superfast package (on ADSL right now) on the 27th October and were given an install date of 8th November by the agent. Can I just ask EE to connect my house via fibre to the pole ?Installation times for FTTP can vary, depending on how close the fibre cable is, and whether you already have an Optical Network Termination unit (ONT). Broadband Fixed Line. They will NOT typically run fibre from the entry point to another location deeper. Openreach have now undertaken 1st and 2nd Stage installation of 1. Hello, I'm hoping someone can provide some insight into a 1 stage install for full fibre. 01-01-2022 3:26 PM. Make sure the builder or developer submits a new development application. Re: FTTP Installation Process I've tried the checker based on the post code and I get this: Sorry this postcode has not been recognised by this checker, this could be because this is a new address with a new postcode that has not yet included in our database or the postcode does not align to an exchange area. Access to SoGEA is widely available. Installation of FTTP. They are both faster than conventional ADSL, but FTTP uses fiber all the way, while FTTC has to rely on a slower copper cable. The bad news, according to several ISPs that we’ve discussed it with, is that Openreach have said they will stop providing ONT BBU units as default in FTTP-only areas and then. NBN FTTP installation for heritage listed terrace. I’d waited this long, so thought that those dates were reasonable. FTTP is available and a new ONT may be ordered. 11 votes, 21 comments. There may also be a £9. (It was Kelly. This is does not work during power cuts to the house. Pheasant said: Pretty easy to tell if you have a laptop running a PPPoE client - ideally Linux/Unix/MacOS - set it in verbose / debug and try and connect to the BNG/Bras with your PPPoE creds. They replaced my FTTC copper wire overhead cable from house to telegraph pole. Stay competitive by offering customers this high-speed upgrade option. Finally, our engineer will carry out remote configuration test and once this is confirmed, the fibre broadband installation process is complete. Some of the recommended locations for installation include: Within 1. GRAY . Until FTTP is built to more of the UK, this is our most widely available and popular broadband type powering both our Superfast Fibre broadband and GFast Fibre broadband products. Consequently, nbn does not currently plan to install a network connection to your building, unless we receive a request from the Owners’. Gov also pushing for 85% gigabit/full fibre availability by 2026 and 100% by 2030. Liaising with customers to ensure installations can. There is a further bit of information available on the DSL Checker. Openreach will conduct a survey to see how they can bring the fibre to your property. However, CP consumption of the Premium option has not materialised. For comparison, most standard FTTC broadband is usually only available in speeds up to around 75Mbps. Actual speeds experienced by end users and quoted by CPs will be lower due to a number of factors within and external to BT's network. Below are pictures of the CSP and the new Nokia ONT Model G-01G-Q. In this video I show you the new tiny BT FTTP Full Fibre ONT internal wall box and explain how long the fibre installation took etc. It follows the route of your phone line - either overhead or via an underground duct (assuming it's OpenReach doing the installing). Our records show the following FTTP network service information for these premises:-Single Dwelling Unit Residential OH Feed with no anticipated issues. The nbn™ Network Termination Device (NTD) may be installed without a battery backup unit (as shown above) or with an optional battery backup unit. 1 x Gigabit WAN. Hello all, last week I finally got my FTTP service installed. Straightforward installation. This is so your engineer can secure their ladders and work safely. Our records show the following FTTP network service information for these premises:-Single Dwelling Unit Residential OH Feed with no anticipated issues. The first should apply to FTTP and say something about your line feed (OH or UG). FTTP Install. Fixed term contract. fast is a product that delivers faster download speeds over the existing telephone line, using a different frequency. We would like to show you a description here but the site won’t allow us. We can install your router and your customers’ equipment in a single, hassle-free appointment. FTTP install process - 1 stage. I am considering moving to FTTP with one of the many FTTP providers such as Zen or even BT Full Fibre. There's definitely a central comms/service room for each floor. Contact a Service Provider with a FTTP compatible broadband product. I can send some pics if you're interested. FTTP is available and a new ONT may be ordered. As the Wholesale Checker says it’s a One Stage I’d hazard a guess it’s been marked down as being served by Duct 56. FTTP install process - 1 stage. KCI2 is the stage at which a committed date for delivery is agreed, barring any unforeseen issues. Hey r/nbn, I'm moving to a new place pretty soon and was using the check address feature on the NBNco website to determine internet availibility. How odd, I am experiencing the exact same with my new BT FTTP install, line all connected, light level tested at both the ONT and pole, both are low light. edit: to clarify, if I ordered Supefast Fibre from BT it would be "up to" 55Mb VDSL2 (FTTC). Mine is due between 8am. #1. Security. 4 million UK premises (build rate of c. The FTTP installation process involves four main steps: planning, construction, testing, and activation. There’s just 2 weeks. I live in a detached house, currently the phone line comes up in the middle of the house under the stairs, I have had low level cupboards with a bench top installed there and the NTE5 is in behind one of the cupboards, the cupboard has no back on it and there is a. FTTP stands for fibre to the premises. Just to add, that the BTW Checker does not show FTTP until it's actually been enabled and available to order. Fibre-to-the-premises, also known as FTTP or full fibre broadband, is a type of fibre optic broadband connection. Key Takeaways. FTTP Install Process; FTTP on Demand: 330: 50--Available--ADSL Products Downstream Line Rate (Mbps) Upstream Line Rate (Mbps) Downstream Range(Mbps) ADSL Availability Date Left in Jumper; WBC ADSL 2+ Up to 17--10 to 19. A connection using both fibre and copper (FTTC) can reach speeds of up to about 66Mbps. From your description if the current feed appears under the stairs through a duct and it is unblocked then this would be the easiest way to get the fibre in to your. GFast: 330 Mbps. We ordered FTTP to replace our woeful FTTC last Friday, and have just been given a date for a week next Tuesday. Typically, though, FTTP is almost always going to be the faster option. This blog is to document the process, equipment, installation and performance of TalkTalk’s Future Fibre 65 Fibre to the Premises (FTTP) and not to be confused with Fibre 65 which is a Fibre to the Cabinet and then a copper. Use our availability checker below to find out if SoGEA is available in your area or for your telephone number. October 16, 2013. 1 stage install – between 9 and 18 working days, depending on availability An engineer will install an ONT at your premises to connect to the nearby fibre cable. . It was ordered in May but there was a duct problem in the nearby area but recently that was resolved. Yes, the plug was pre-fitted on the. FTTP is not available. If folk want (and if I've solved my smartphone battery death issue by then) I'll see if I can provide information during the process. Stage one would be to get the tubing (OH/UG) up to the CSP at the customers premises. After the results window there are several paragraphs of narrative. Type the following command: $ sudo apt-get install tftp OR # apt-get install tftp Sample outputs: Reading package lists. FTTP Install with Nokia ONT - Pictures Enclosed. One thing common in both is a fibre optic cable running directly from the Internet Service Provider (ISP) to a home or business location. This shows up on the Checker as 2 Stage. I could have scheduled it for late April but I was going on a long roadtrip so Mid- May it was. Usually your engineer will use the hole from your existing phone line. 1 Stage 1: External Work. Re: KCI2 ASSURE. You. In process of building a house. 2:8 splitter is considered as S1 and 1:8 splitter considered as S2 splitter. 2nd Openreach visit to bring the fibre from the small box on your property to inside and to install the internal equipment. The BBU simply consists of four replaceable 2000mAH-NiMH (1. Edited by Micro (Thu 01-Apr-21 19:27:04) DrPepper. . e. I think the visit is within a week of ordering. I recently had Community Fibre FTTP broadband installed, and found that I couldn’t see much information online about the equipment and process – so here’s what I now know. 1. The first install has been done and the cable terminated in the box on the outside wall of the house. On average an NBN. FTTP stands for fibre to the premises, and essentially refers to fibre broadband that is wired directly to the home instead of a cabinet that services the area (which is referred to as FTTC, or fibre to the cabinet). ) The ONT will be installed during FTTP install process 2 Stage. TSP45. FTTP ordering in my postcode went active last Monday and I placed an order the same day. David. However last month I noticed overhead fibre cables bought down telegraph poles and tied up out side each property. your upcoming installation, and help to answer any questions you may have. A further five days will be needed to connect your broadband. But a full-fibre connection (FTTP) - with no copper - can offer much faster average speeds of one gigabit. Hello. Re: KCI2 ASSURE. A Fibre to the Premises (FTTP) connection is used in circumstances where a fibre optic line will be run from the nearest available fibre node, directly to your premises. 4. Hopefully that means someone has already had it installed in my block and the wiring is all done. Browse, stream and download on multiple devices with speeds up to 944Mb/s. I’m talking about the box that is mention here: “ First of all, we'll connect a fibre cable to a small box that we'll fix to your outside wall, close to where your phone line enters your home. Find out everything you need including information on equipment and installation. We'll drill a small hole in your wall to push the cable through, before covering it tidily with the box. Fiber from the registrant's home or office to the central. The first few stages seemed to occur almost in tandem, with one engineer working to install a weatherproof wall box a few feet up the wall, while another was busy drilling from inside-out through the wall to. 0. 21 out of 54 properties on our close show as FTTP available. Once the installation completes, you should. The installation has the physical appearance of being FTTdp on the telegraph pole next to my house. All the ducting has been buried in place for fibre optic broadband, now it has to be bought in from the pavement to the property. Overall, Virgin Media aims to make the installation process as smooth and hassle-free as possible, and their customer service team is always available to answer any questions or concerns you may have.